DALLAS ISD - ORG 184 MILAM ELEMENTARY SCHOOL
The Ben Milam ES scope of work shall include (but not be limited to the following) a variety of repairs and improvements consisting of repairing the exterior waterproofing along the perimeter of the building(s), including the required excavation, regrading and landscaping; power wash the masonry facades to remove unwanted mildew, stains etc... repoint, tuck masonry joints and repainting other metal type features along the exterior perimeter; replacement of the fire alarm system and PA system (Alternate); replacing and providing new exterior and interior lighting; HVAC upgrades at various areas (i.e. IDF/MDF rooms); replacement of existing gym windows with new energy efficient glazing systems; and replacement of existing floor materials with new (vct, carpet, and base) in the school.
SPECIFICATIONS
(click to expand/collapse)
Name | Size | |||
COVER -TOC | 1.4 MB | |||
COVER - TOC VOL.II | 1.7 MB | |||
Division 0 - VOL I | 8.1 MB | |||
Division 1 - VOL I | 2.5 MB | |||
Division 1 | 12.3 MB | |||
Division 2 | 181.3 KB | |||
Division 3 | 618.7 KB | |||
Division 4 | 660.0 KB | |||
Division 5 | 162.0 KB | |||
Division 6 | 259.5 KB | |||
Division 7 | 787.8 KB | |||
Division 8 | 1.1 MB | |||
Division 9 | 1.5 MB | |||
Division 10 | 493.9 KB | |||
Division 13 | 221.9 KB | |||
Division 21 | 192.5 KB | |||
Division 22 | 2.6 MB | |||
Division 23 | 2.1 MB | |||
Division 26 | 909.3 KB | |||
Division 27 | 228.8 KB | |||
Division 28 | 306.8 KB | |||
Division 31 | 1.1 MB | |||
Division 32 | 635.2 KB | |||
Division 33 | 271.4 KB |