DALLAS ISD - ORG 184 MILAM ELEMENTARY SCHOOL

The Ben Milam ES scope of work shall include (but not be limited to the following) a variety of repairs and improvements consisting of repairing the exterior waterproofing along the perimeter of the building(s), including the required excavation, regrading and landscaping; power wash the masonry facades to remove unwanted mildew, stains etc... repoint, tuck masonry joints and repainting other metal type features along the exterior perimeter; replacement of the fire alarm system and PA system (Alternate); replacing and providing new exterior and interior lighting; HVAC upgrades at various areas (i.e. IDF/MDF rooms); replacement of existing gym windows with new energy efficient glazing systems; and replacement of existing floor materials with new (vct, carpet, and base) in the school.
Addenda 1 (click to expand/collapse)
Name Size
CSP 206776 Milam Addendum No 1 15.3 MB