DALLAS ISD - E307 P003-3 NEW H. S. THOMPSON ELEMENTARY SCHOOL

Competitive Seal Proposal - Project consisting of the construction a new twostory 73,763 Sq.Ft. Elementary School

Status

Accepting Bids

Prebid Date9/30/19 10:00 am

Bid Date10/16/19 2:00 pm

Company & Contacts

Dallas ISD 2015 Bond Program

DISD - Rose Kohut   rkohut@dallasisd.org

Location

Dallas, TX 75234

CD included with purchase of complete set. Specs seperated by section and plans by sheet names.

HALF SIZE SETS AVAILABLE UPON REQUEST

SCOPE OF WORK:
ORG 307 – H.S. Thompson Elementary School – Project consisting of the construction a new twostory 73,763 Sq.Ft. Elementary School on a 5.73 Acre Site. The new H.S. Thompson Elementary
School is being constructed on the site of the previous school which has been demolished and the
area backfilled. The new structure is conventional steel with structural CMU in select locations. A
Storm Shelter meeting the requirements of the ICC 500 has been incorporated into the project.
Primary interior spaces include core curriculum classrooms, science classrooms, library/ media lab,
gymnasium, cafeteria, library, art, choir and dance rooms. Exterior improvements include vehicular
drop off drives, parking lots and playgrounds.

BUDGET:
Total for E307_P0037_3 $19,000,000.00- $23,000,000.00

PRE-BID DATE:
A pre-proposal meeting will be held at 10:00 AM on Monday, September 30, 2019 at 3801 Herschel
Ave. Room 121 A for all interested parties. This meeting is not mandatory, but information
discussed will be very helpful in preparation of the proposal.

All general contractors and sub-contractors are encouraged to attend this meeting. Contractors will meet A/E(s) and PM at each school to start site tours. The first site tour will take place immediately following the preproposal conference. The following is the schedule for all site tours:

BID DATE:
All Construction Services construction procurements must be physically delivered to the Construction
Services office, at 3801 Herschel Ave, Dallas, TX 75219. (Call 972.925.7200 for directions). Delivery to other locations will result in rejection of a CSP.
Completed CSP Package Part 1-A, 1-B and 1-C are due on Wednesday, October 16, 2019 at 2:00 PM
(local time);

Completed CSP Package Part 2 is due on Thursday, October 17, 2019 at 3:00 PM (local time);

Any materials received after the respective closing dates / times will not be considered.

BID METHOD:
Competitive Sealed Proposals

A/E Firm Name:
KAI
Attention: L. Lorraine Jackson
Address: 101 North Zang Boulevard, Suite 100
City, State, Zip: Dallas, Texas
Email: ljackson@kai-db.com

Procurement Manager: Dallas ISD Procurement Director
Attention: Rose Kohut
Address: 3801 Herschel Ave
City, St, Zip: Dallas, TX 75219
Email: rkohut@dallasisd.org