DALLAS ISD - ORG 021 - WT WHITE HS SCHOOL - ADDITION AND RENOVATION.

WT White HS School addition and renovation.

Status

Bidding Closed

Prebid Date9/6/22 10:00am

Bid Date10/5/22 2:00pm

Company & Contacts

FWHCC
Dallas ISD Procurement Services  
ProcurementCS@dallasisd.org

Location

Dallas, Texas

All digital files included with purchase of complete printed set via file transfer. Specs seperated by section and plans by sheet names.

Half Size Available upon Request

NOTICE: INVITATION TO BID

SCOPE OF WORK:
Scope of Work. The Work consists of: ORG 021 – WT White HS Addition and Renovation

1. Updated Theatrical AV Systems in Auditorium.
2. Updated Classroom teaching surfaces and finishes in original classrooms.
3. Repaint all interior surfaces
4. New ancillary locker room buildings at baseball and softball fields.
5. Window and Glazing Replacements in parts of campus.
6. Renovate existing small gym, clinic and science prep areas.
7. Updating lighting to LED lighting on interior and exterior of building.
8. Cleaning and sealing of exterior masonry
9. Repainting all exterior painted surfaces.
10. Interior Door and hardware replacements.
11. City and private sidewalk and curb curt replacements
12. Softball Bleachers upgrades
13. Security and clock updates
14. Landscaped areas updated and replacements.

PRE-BID DATE
A pre-proposal meeting will be held at 10:00 am on Tuesday 09/06/2022 via Zoom Meeting for all interested parties. This meeting is not mandatory, but information discussed will be extremely helpful in preparation of the proposal.

Join Zoom Meeting:
https://dallasisd.zoom.us/j/85865998925?pwd=aVN5NlBkZDVGQ1gzQ1pFN2tZU003dz09

Meeting ID: 858 6599 8925
Passcode: 159315

BID-DATE & LOCATION:
All Construction Services construction procurements must be physically delivered to the Construction Services office, at the Linus D. Wright Dallas ISD Administration Building 9400 North Central Expressway, Suite 800 Dallas, TX 75231. (Call 972.925.7200 for directions). Delivery to other locations will result in rejection of a CSP.

Completed CSP Package Part 1-A, 1-B and 1-C are due on Wednesday, 10/05/2022 at 2:00PM (local time).

Completed CSP Package Part 2 is due on Thursday, 10/06/2022 at 3:00 PM (local time).

Any materials received after the respective closing dates / times will not be considered.

OWNER
Dallas ISD Procurement Services c/o Bond/Construction Services
Linus D. Wright Dallas ISD Administration Building
9400 North Central Expressway, Suite 800
Dallas, TX 75231

BID METHOD:
Competitive Sealed Proposal