DALLAS ISD - ORG 385 - MONTESSORI ACADEMY AT ONESIMO HERNANDEZ - RENOVATION.

The scope of this portion of the renovation will include a new secure vestibule with an 81 square foot addition that will connect the existing vestibule to the existing reception area.

Status

Bidding Closed

Prebid Date10/31/22 2:30pm

Bid Date11/29/22 2:00pm

Company & Contacts

FWHCC
Dallas ISD Procurement Services  
ProcurementCS@dallasisd.org

Location

Dallas, Texas

All digital files included with purchase of complete printed set via file transfer. Specs seperated by section and plans by sheet names.

Half Size Available upon Request

NOTICE: INVITATION TO BID

SCOPE OF WORK:
The scope of this portion of the renovation will include a new secure vestibule with an 81 square foot addition that will connect the existing vestibule to the existing reception area. All existing exterior
building joints and waterproofing seals around windows will be replaced and/or upgraded. A new, dig-ital marquee sign will be installed at the entry of the school. Exterior building wall pack lighting and
controls will be replaced. The pavement around the new vestibule area and entry courtyard will be
replaced along with the sidewalks connecting the school entry to Maple Avenue. New air-cooled chill-ers will be installed in place of the existing cooling towers. A new fire alarm system will be installed
throughout the building.

BUDGET: $ 3,526,256.00

PRE-BID DATE AND LOCATION:
A pre-proposal meeting will be held at 2:30 PM on Monday, October 31, 2022 at 5555 Maple Ave, Dallas, TX 75235 for all interested parties. This meeting is not mandatory, but information discussed will be extremely helpful in preparation of the proposal.

BID-DATE & LOCATION:
All Construction Services construction procurements must be physically delivered to the Construction Services office, at the Linus D. Wright Dallas ISD Administration Building 9400 North Central Expressway, Suite 800 Dallas, TX 75231. (Call 972.925.7200 for directions). Delivery to other locations will result in rejection of a CSP.

Completed CSP Package Part 1-A, 1-B and 1-C are due on Tuesday, November 29, 2022 at 2:00 PM (local time).

Completed CSP Package Part 2 is due on Wednesday, November 30, 2022 at 3:00 PM (local time).

Any materials received after the respective closing dates / times will not be considered.

OWNER
Dallas ISD Procurement Services c/o Bond/Construction Services
Linus D. Wright Dallas ISD Administration Building
9400 North Central Expressway, Suite 800
Dallas, TX 75231

OWNER’S PROJECT MANAGER (PM)
JACOBS will be the Owner’s Project Manager (PM) for the management of planning, design,
permitting, construction, and post-construction for this CSP. All correspondence and
communication during the contract finalization, construction and post-construction processes
shall be directed to the Architect/Engineer firm (A/E) with copy to JACOBS. During construction,
the PM shall have authority to act on behalf of Dallas ISD for Owner related direction.

ANGEL SILVA, Project Manager, JACOBS
Dallas Independent School District
Construction Services
Linus D. Wright Dallas ISD Administration Building
9400 N. Central Expressway Suite 800
Dallas, TX 75231
Phone: (939)644-9402
E-mail: C88316@dallasisd.org

**ARCHITECT/ENGINEER FIRM (A/E) **
OMNIPLAN
1845 WOODALL RODGERS FWY, SUITE 1600, DALLAS, TX 75201
Main Contact: AARON FARMER
Phone: 214.775.0695
Fax: N/A
Email: afarmer@omniplan.com

BID METHOD:
Competitive Sealed Proposals